![]() I suspect that this would be a characteristic of all inverters to a greater or lesser extent. Depending on the extent of the load change and export overshoot this can vary from a few cycles to a few seconds. So when things change there is a short period of export until the electronics detect this and back off production back "towards" zero. Its only once you are exporting that you can pull in the reigns and stop generating power. A construction manual and full blueprints are provided for each. Stopping exporting is essentially the same thing. We offer free custom design services and package estimates, site con- LOG PROFILES. They are reactionary, they only activate and do something about it once a problem is detected. That same theory tells us that a control loop cannot work (be closed) unless there is a small error. Monitoring the flow of power and controlling it to meet a parameter are cornerstones of control loop theory. CASH POWER 3 phase electricity prepaid meter CONLOG BEC44PL (wired) prepaid meters CONLOG BEC Nano prepaid meters CONLOG BEC23 PLT prepaid meters CONLOG BEC44 wireless prepaid meters. That cause the pre-paid meter to disconnect power for 30 seconds. My pre-paid meter is very sensitive for reverse current, so if there is a large shift in power, like a kettle switching off, the system can export power for a short time. Is anyone using a pre-paid meter with an inverter.Įvidently even though export is set to Zero when the load suddenly drops the inverter can export to the meter causing the meter to switch off power.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |